New Wastewater Treatment Plant for the Visp Bypass Tunnel

For both portals of the Visp bypass tunnel, Tecnoidea Impianti installed a complete, semi-mobile wastewater treatment plant in container format.

The required technology was developed and refined by Tecnoidea over many years and numerous tunnel-construction projects, such as the NEAT.

The plant was designed around the following process steps:

  • Neutralisation with carbon dioxide
  • Clarification and flocculation
  • Sedimentation and sludge dewatering
  • Sand filtration
  • Nitrite oxidation

As metcam ag, together with Tecnoidea Impianti, we support projects like this from planning and installation through to commissioning and after-sales service.